Several phases of the scheduled repairs to the ramps and main lanes are now complete.
Keep in mind that several phases of repair and construction may occur simultaneously.
Currently, construction is located in the following location:
1. The far left lane of eastbound IH-20 will be closed. Stay in the right lanes of IH-20 and merge with IH-820. (Sheet 9).
Refer to the maps attached in the Additional Information below.
All travelers should follow detour signs and use caution around construction activity.
The City of Benbrook will post status reports on the remaining phases of work, as provided by TxDOT.
Check the City of Benbrook webpage for updates (www.benbrook-tx.gov).